PARKING LOT WORK PT1

A documentation of recent construction work on the layout...

The problem: bare cork showing at the edge of the road. What was needed was more gravel along the edge to match the shoulder on the other side of the entrance ramp.

Sam and the contractor discuss the work to be done. The gravel is loaded on the dump truck, ready to be dumped and spread out. Meanwhile, the wheelbarrow and air compressor trailer by the shop have been moved out of the way.
Here the gravel is being dumped in preparation for spreading.